| 
The trick is probably to let go
before you get pulled into the rhyne |

Our first six metre kit bridge.
Everything seems pretty straightforward.
| 
But we really needeed everything
completely level so at this point out came the partially constructed
stiles |

So that we could excavate the bank
to fit the bearers |

This really is a case of learning
on the job
| 
But now we are finally properly
level and lined up |
|

Frankie Howard thinks he might need
a hip replacement |
The post holes can be firmed up
| 
And distances rechecked |
| 
Eric at first slip awaits the deflection
off Dave's head |

This is no time for a pit stop
| 
That's the drill -- keep the uprights
correctly positioned with our strap innovation. |
| 
A well drilled team hammering on |

Bryn and Eric attampt to stun fish
with a length of timber
| 
Bryn values his thinking time |

Tony watches team members try to
nail each other to the bridge |

Rick wonders when someone will let
him play too
| 
I can't work it out says Bryn --leaving
"it out" would be more accurate reply the others |
|

Final bolt tightening |

Rick gets encouragement as he learns
how to climb over a stile
| 
The bridge team |